{"id":1374,"date":"2026-02-09T20:44:33","date_gmt":"2026-02-09T20:44:33","guid":{"rendered":"https:\/\/d.sheep-mine.ts.net\/?p=1374"},"modified":"2026-02-09T20:44:33","modified_gmt":"2026-02-09T20:44:33","slug":"128129547-cms","status":"publish","type":"post","link":"https:\/\/d.sheep-mine.ts.net\/?p=1374","title":{"rendered":"PSLV-C62 Mishap: Failure analysis committee to be formed soon | India News &#8211; The Times of India"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div>\n<div class=\"MwN2O\">\n<div class=\"vdo_embedd\">\n<div class=\"T22zO\">\n<section class=\"D3Wk1  clearfix id-r-component leadmedia undefined undefined  VtlfQ\" style=\"top:0px\">\n<div class=\"D3Wk1\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">\n<div class=\"zPaFh\">\n<div class=\"wJnIp\"><img src=\"https:\/\/static.toiimg.com\/thumb\/msid-128129642,imgsize-641173,width-400,resizemode-4\/-.jpg\" alt=\"PSLV-C62 Mishap: Failure analysis committee to be formed soon\" decoding=\"async\" fetchpriority=\"high\"\/><\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div><\/div>\n<\/div>\n<p>BENGALURU: Isro, which has been analysing the data from the failed PSLV-C62 from Jan 12, is expected to formally constitute a Failure Analysis Committee (FAC) to investigate the causes for the mishap and recommend corrective measures soon.<span class=\"id-r-component br\" data-pos=\"2\"\/>It has been nearly a month since the failure, the second for PSLV in as many attempts, and so far, the analysis has been done by an expert committee that is being called \u201cdata analysis committee\u201d or DAC internally, multiple sources confirmed to TOI.<span class=\"id-r-component br\" data-pos=\"4\"\/>Isro chairman V Narayanan told TOI: \u201cThe expert committee is analysing the data,\u201d without elaborating further. The DAC\u2019s task, one scientist said, was to analyse telemetry, ground station records, log books and process documents, and place them on a single timeline before any higher-level inquiry begins. <span class=\"id-r-component br\" data-pos=\"8\"\/>To do this, another scientist said that the DAC has about around six minutes of flight information, recorded at intervals as fine as two milliseconds. He described this as a large amount of material that could reveal the health of the vehicle up to the moment of the anomaly.<span class=\"id-r-component br\" data-pos=\"10\"\/>Isro has not indicated a timeline for the next PSLV launch \u2014 built by the HAL-L&amp;T consortium \u2014 which was initially expected in the first quarter of this calendar year. Multiple sources confirmed that the mission has been put on hold until the analysis of the PSLV-C62 failure is complete. <span class=\"id-r-component br\" data-pos=\"14\"\/>\u201cThe committee [DAC] is in the final leg of its analysis and once it completes the process, the FAC will be formally set up. This could happen very soon, in just a few days,\u201d one source said. Unlike the DAC, which is being headed for a former Isro chairman and comprises internal teams, the FAC will comprise experts from outside the Department of Space (DoS) too.<span class=\"id-r-component br\" data-pos=\"17\"\/>Aside from analysing the data from the PSLV-C62 mission to determine what exactly occurred during the mission, the DAC\u2019s second priority, the scientist said, was to check for any link with the previous failure (PSLV-C61 from May 2025), followed by a complete review of the 33-year-old PSLV vehicle. <span class=\"id-r-component br\" data-pos=\"19\"\/>\u201cHaving two repeated failures, it is essential to revisit the entire PSLV once again,\u201d the scientist said. He added that the role of the DAC was to provide all the information that the FAC may require to carry out its analysis.<span class=\"id-r-component br\" data-pos=\"22\"\/>\u201cThere will be data from telemetry, ground station, tracking data, other information about processes and tests, all of which need to be analysed and presented properly for the FAC to begin work,\u201d the scientist said.<span class=\"id-r-component br\" data-pos=\"24\"\/>While Isro has not formally said that the launches of other launch vehicles, the agency has been carrying out stringent reviews ahead of all planned missions. As reported by TOI last week, it is gearing up for a GSLV mission, while the planned SSLV mission is said to be put on hold given that its second stage is the same as the PSLV\u2019s third stage (PS3).<span class=\"id-r-component br\" data-pos=\"27\"\/>On Jan 12, after a normal lift-off and second stage performance, the PSLV-C62 suffered a glitch in PS3, which led to the failure. \u201c&#8230;Close to the end of the third stage, we saw little more disturbance in the vehicle roll rates and subsequently there was a deviation in the flight path. We are analysing the data and we shall come back at the earliest,\u201d Narayanan had said soon after.<span class=\"id-r-component br\" data-pos=\"29\"\/><\/div>\n\n<p><a href=\"https:\/\/timesofindia.indiatimes.com\/india\/pslv-c62-mishap-failure-analysis-committee-to-be-formed-soon\/articleshow\/128129547.cms\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BENGALURU: Isro, which has been analysing the data from the failed PSLV-C62 from Jan 12,&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1375,"comment_status":"","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[724,4230,723,719,720,721,4231,4233,4232,4229,722],"class_list":["post-1374","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-breaking-news","tag-failure-analysis-committee-isro","tag-google-news","tag-india","tag-india-news","tag-india-news-today","tag-isro-pslv-mission","tag-pslv-rocket-analysis","tag-pslv-c61-failure-link","tag-pslv-c62-failure","tag-today-news"],"_links":{"self":[{"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=\/wp\/v2\/posts\/1374","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1374"}],"version-history":[{"count":0,"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=\/wp\/v2\/posts\/1374\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=\/wp\/v2\/media\/1375"}],"wp:attachment":[{"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1374"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1374"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1374"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}