{"id":10185,"date":"2026-04-08T12:54:41","date_gmt":"2026-04-08T12:54:41","guid":{"rendered":"https:\/\/d.sheep-mine.ts.net\/?p=10185"},"modified":"2026-04-08T12:54:41","modified_gmt":"2026-04-08T12:54:41","slug":"130114119-cms","status":"publish","type":"post","link":"https:\/\/d.sheep-mine.ts.net\/?p=10185","title":{"rendered":"Jaipur Metro Phase-2: Cabinet approves Rs 13,038 crore project; 41-km corridor to boost connectivity &#8211; The Times of India"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div data-articlebody=\"1\"><video-embed value=\"false\"\/><\/p>\n<div class=\"ihgno clearfix  \">\n<div class=\"e9jwa\">\n<div class=\"vdo_embedd\">\n<div class=\"GfdvZ\">\n<section class=\"_bIDB  clearfix id-r-component leadmedia undefined undefined  E9tg9 \" style=\"top:0px\">\n<div class=\"_bIDB\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">\n<div class=\"ypVvZ\">\n<div class=\"WGttI\"><img src=\"https:\/\/static.toiimg.com\/thumb\/msid-130114124,imgsize-995972,width-400,height-225,resizemode-4\/-.jpg\" alt=\"Jaipur Metro Phase-2: Cabinet approves Rs 13,038 crore project; 41-km corridor to boost connectivity\" decoding=\"async\" fetchpriority=\"high\"\/><\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div><\/div>\n<\/div>\n<p>The Union Cabinet on Wednesday approved Jaipur Metro Phase-2, a 41-km North\u2013South corridor from Prahladpura to Todi Mod with 36 stations, at a total cost of Rs 13,037.66 crore, according to a government statement.<span class=\"id-r-component br\" data-pos=\"2\"\/>The project will be implemented by Rajasthan Metro Rail Corporation Limited (RMRCL), a 50:50 joint venture of the Centre and the Rajasthan government, and aims to provide \u201cseamless connectivity\u201d to key nodes including Sitapura Industrial Area, VKIA, Jaipur Airport, Tonk Road, SMS Hospital, Ambabari and Vidhyadhar Nagar.<span class=\"id-r-component br\" data-pos=\"4\"\/>The corridor will include underground stations near the airport and will integrate with the existing Phase-1 through interchanges and feeder systems, ensuring a unified metro network across Jaipur.<span class=\"id-r-component br\" data-pos=\"8\"\/>At present, Phase-1 &#8211;an 11.64-km East\u2013West corridor from Mansarovar to Badi Chaupar&#8211;carries around 60,000 passengers daily. With Phase-2, ridership is expected to see a \u201cmanifold increase\u201d, boosting public transport share and reducing dependence on private vehicles.<span class=\"id-r-component br\" data-pos=\"10\"\/>The project has cleared multiple appraisal stages and has an Economic Internal Rate of Return (EIRR) above 14%, indicating strong socio-economic viability. Funding will be through equity support from the Centre and state, along with subordinate debt and multilateral financing, in line with the Metro Rail Policy, 2017.<span class=\"id-r-component br\" data-pos=\"12\"\/>Aligned with Rajasthan\u2019s TOD Policy-2025 and national urban mobility goals, the project is targeted for completion by September 2031 and is expected to ease congestion, cut emissions and enhance mobility across the city.<span class=\"id-r-component br\" data-pos=\"14\"\/><\/div>\n<\/div>\n\n<p><a href=\"https:\/\/timesofindia.indiatimes.com\/business\/india-business\/jaipur-metro-phase-2-cabinet-approves-rs-13038-crore-project-41-km-corridor-to-boost-connectivity\/articleshow\/130114119.cms\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Union Cabinet on Wednesday approved Jaipur Metro Phase-2, a 41-km North\u2013South corridor from Prahladpura&#8230;<\/p>\n","protected":false},"author":1,"featured_media":10186,"comment_status":"","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[25261,25259,25262,25263,25260],"class_list":["post-10185","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-41-km-north-south-corridor","tag-jaipur-metro-phase-2","tag-jaipur-public-transport","tag-metro-rail-policy-2017","tag-rajasthan-metro-rail-corporation-limited"],"_links":{"self":[{"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=\/wp\/v2\/posts\/10185","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10185"}],"version-history":[{"count":0,"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=\/wp\/v2\/posts\/10185\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=\/wp\/v2\/media\/10186"}],"wp:attachment":[{"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10185"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10185"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/d.sheep-mine.ts.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10185"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}